Fullerton, CA (1134 S Harbor Blvd)

Operated: Dec. 17, 1991 - Nov. 17, 2020
Latitude Longitude: 33.85966522, -117.9239737
Latitude Longitude: 33.85966522, -117.9239737
Stages:
- Concept Unification Stage (Dec. 17, 1991–May 2007) (One of 10 3-Stages in California to undergo Concept Unification. 3-Stage converted from a stage that came from Creative Engineering. First 3-Stage installed in a new Chuck E. Cheese's location.)
- Studio C Beta (?–Nov. 17, 2020)
Another photo of Fullerton's Toddler Zone before it was relocated (Along with the Salad Bar and Showroom) during the 2005 Update of the [[2003 'Cool Chuck' Reconfiguration / Major Remodel Initiative]] in June 2007 (2000's) (PC: Unknown).
Street View of Fullerton's Exterior in June 2007 when they were remodeling to the 2005 Update of the [[2003 'Cool Chuck' Reconfiguration / Major Remodel Initiative]] (PC: Google Maps)
The Skytubes before they were relocated during the 2005 Update of the [[2003 'Cool Chuck' Reconfiguration / Major Remodel Initiative]] in June 2007 (2000's) (PC: Unknown)